Page 12 of 102 Base Station location
553-3601-106 Standard 2.00 September 1996
•
If there are three or four Base Stations at the cell center, install them on
the ceiling.
•
If there are one or two Base Stations at the cell centers, you can install
the Base Stations upright on a wall, or on a ceiling as shown in Figure 7.
Figure 7 : Base Station positioning
COMPANION
COMPANION
COMPANION
COMPANION