Weider 6900 User Manual page 17

Table of Contents

Advertisement

25. Attach the Low Cable (53) to the U-bracket (45)
with an M6 Washer (82) and an M6 Locknut (51).
See the inset drawing. Do not overtighten the
M6 Locknut (51); it should be threaded onto
the end of the Low Cable (53) so that only
two threads are showing above the Locknut.
26. See the CABLE DIAGRAM. Identify the High
Cable (55).
Route the High Cable (55) upward through the
Top Frame (4) and over a Thick Pulley (48).
Make sure that the eyelet end (D) of the High
Cable is in the indicated location.
Attach the Thick Pulley (48) inside the Top
Frame (4) with an M10 x 68mm Bolt (71), two
M10 Washers (57), two 13mm Spacers (52), and
an M10 Locknut (56).
27. Route the High Cable (55) over a Thin Pulley
(47) and downward through the Top Frame (4).
Attach the Thin Pulley (47) inside the Top Frame
(4) with an M10 x 68mm Bolt (71), an M10
Washer (57), and a 10mm Spacer (86). Make
sure that the Thin Pulley does not fall out of
the Top Frame while you complete steps 28
and 29.
Note: Another Thin Pulley (not shown) will be
installed inside the Top Frame (4) with the same
M10 x 68mm Bolt (71) in step 29.
25
45
51
53
26
48
56
57
52
55
D
27
17
51
45
82
53
4
52
57
71
47
55
4
86
57
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

14922.3

Table of Contents