Installation; Transportation; Positioning; Aeration - sangiorgio SDR8 Use And Maintenance Manual

Table of Contents

Advertisement

INSTALLATION

Transportation

Transportation of the dryer can be carried
out as shown in the illustration below.
For transportation, use a trolley positioned
only on the right or left side of the wall.
Attention!
Incorrect handling of the dryer can
cause damage to things and people.
Pay attention during the handling
phase and in case of overturning wait
an hour before switching on to avoid
damage to the heat pump.

Positioning

Before installing the appliance, careful-
ly read the instructions in the Safety and
Warnings chapter
For maximum performance, it is advisable
to position the dryer in a perfect level with
levelling instrument and compensate for
any irregularities on floor surface with the
adjustable feet.
Figure 1
Attention!
Before normal use of the appliance,
clean the drum with a damp cloth in
order to eliminate any traces of lubri-
cants used in the production process.

Aeration

The drying process causes the dryer to
heat up with simultaneous heating of the
external environment. For this reason it is
advisable to always ventilate the room.
ATTENTION!
Do not cover the openings for the
cooling air in front when the dryer is
running.
Do not cover or reduce the space be-
tween the floor and the base of the
dryer (pedestals, strips, rugs).
Place the appliance in vertical posi-
tion and wait 12 hours before starting.
14
Figure 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdr9

Table of Contents