Required Utilities - Uniflex UA 4 Operation Manual

Table of Contents

Advertisement

Figure 4-4 Power unit installation

4.3.1 Required utilities

Type UA4_ MVC
(220V – 240V)
Type UA4_08_11
(220V – 240V)
Capacity
Back-up fuse
Transport, dimensions, installation, intermediate storage
Make sure that the following utilities are provided upon delivery of the
device:
Voltage /
Frequenz
230V
50Hz
230V
60Hz
115V
50Hz
115V
60Hz
1 kW
1 x 16 A
Table 4-2 Electric power supply
UNIFLEX-Hydraulik -
Mount the power unit in the immediate
vicinity of the device on a solid work-
bench and fix it using
 four machine screws M 8
using the hole pattern
 140 x 140 mm.
not included with the device.
Mot.
Volllast
Nennstrom A
350 bar
7,8
9,6
5,4
11,2
15,5
20,8
10,7
24,3
26 – www.uniflex.de
The machine screws M 8 are
Ohne Last
Einstellung
3,9
10,0
3,7
12,0
7,4
15,5
7,1
16,0

Advertisement

Table of Contents
loading

Table of Contents