For rope exits at certain angles, individual rope slip off guard can be moved or removed.
up to 1000kg
To prevent the rope from slipping off when slack, the rope must be guided under at least one rope slip off
guard.
6.3

Tools

108-22
capacity
250kg – 500kg
1000kg
2000 - 5000kg
12500kg
20000kg
7

Control

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
 Only use wire ropes, that do not exceed the maximum permitted diameter.
 Put the wire rope properly on the pulley and ensure that the rope rests on the groove base.
 Check screw connections.
8

Commissioning

8.1

General

The operator of the unit is responsible for the entire system.
According to the Ordinance on Industrial Safety and Health, a hazard analysis must be carried out by the
operator.
Observe the respective national standards, regulations and directives of the responsible bodies at the place
of operation.
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a
"qualified person" before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and
trolley movement, must be tested by a "licensed qualified person" before putting in operation.
An exception is "hoists ready for operation" acc. validated national regulations with EU-declaration of
conformity.
12
tool
size
M6
M8
M10
M16
M20
from 2000kg
usage
axial securing
Rope slip off guard
5.52.624.01.01.00

Advertisement

Table of Contents
loading

Table of Contents