Verify the Installation
To complete the installation, connect the power cord first to the power receptacle
on the hub rear panel and then to the power outlet on the wall. When power has
been applied to the hub:
•
The green Pwr (Power) LED on the front panel is on.
•
The green Link LED on each connected port is on.
If there are any problems, refer to "Troubleshooting Information."
TP
Model EN104
/EN106
TP
TP
/EN108
Ethernet Hub Installation Guide