Verify Installation
To complete the installation, connect the power cord first to the power receptacle
on the hub rear panel and then to the power outlet on the wall. When power has
been applied to the hub:
•
The green Pwr (Power) LED on the front panel is on.
•
The green Link LED on each connected port is on.
•
The green Active LED on each connected AUI port is on.
•
The green Active LED on each connected BNC port is on.
If encounter any problems, refer to "Troubleshooting" on page 4.
Model EN104/EN108/EN116 Ethernet Hub Installation Guide