Step 2: Installing the Switch
You can install your NETGEAR Model FSM7326P Managed Power over Ethernet Switch on a flat surface
or in a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on each of the four
concave spaces on the bottom of the switch. The rubber footpads cushion the switch against
shock/vibrations.
Installing the Switch in a Rack
To install the switch in a rack, use the following procedure. To perform this procedure, you need the 19-
inch rack-mount kit supplied with your switch.
1. Attach the supplied mounting brackets to the side of the switch.
2. Insert the screws provided in the rack-mount kit through each bracket and into the bracket mounting
holes in the switch.
3. Tighten the screws with a #1 Phillips screwdriver to secure each bracket.
4. Align the mounting holes in the brackets with the holes in the rack, and insert two pan-head screws with
nylon washers through each bracket and into the rack.
5. Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.
Step 3: Checking the Installation
Before you apply power:
o Inspect the equipment thoroughly.
o Verify that all cables are installed correctly.
o Check routing to make sure cables are not damaged and do not create a safety hazard.
o Be sure all equipment is mounted properly and securely.
Step 4: Applying AC Power
NETGEAR Model FSM7326P Managed Power over Ethernet Switch does not have an ON/OFF switch; the
only method of applying or removing AC power is by connecting or disconnecting the power cord. Before
you connect the power cord, select an AC outlet that is not controlled by a wall switch so you can easily
turn off power to the switch. After you select an appropriate outlet, use the following procedure to apply AC
power:
Figure 3-1. Attaching Mounting Brackets
Page 14 of 23