3. HOW TO INSTALL THE INDOOR UNIT

3-1. Preparation for Suspending

This unit uses a drain pump. Use a carpenter's level to check that the unit is level.

3-2. Suspending the Indoor Unit

(1) Fix the suspension bolts securely in the
ceiling using the method shown in the
diagrams, by attaching them to the ceiling
support structure, or by any other method
that ensures that the unit will be securely
and safely suspended.
(2) Follow the diagram to make the holes in the ceiling.
Install the inspection opening on the electrical component box side where maintenance and
inspection of the electrical component box and drain pump are easy.
(3) Determine the pitch of the suspension bolts using the supplied full-scale installation diagram
(printed on container box).
The diagram show the relationship between the positions of the suspension fitting, unit, and
panel.
Use the nut (field supply) and washer (supplied) for upper and lower position of the
suspension lug.
Refrigerant tubing joint (gas side)
Suspension lug
* The overlapping portion between the ceiling and panel for cassette should be kept over 20 mm.
B: 585 ~ 600 mm
A: 530 mm
Indoor Unit
View from top
Refrigerant tubing joint (liquid side)
575 mm
34 mm
186 mm
625 mm
Hole-in-anchor
Hole-in-plug
Suspension bolt
(M10 or 3/8")
(field supply)
Electrical component box
A: (suspension bolt pitch)
B: (ceiling opening dimension)
Inspection access
450 mm × 450 mm
(Field supply)
Over 100 mm
Drain outlet (other side)
(VP20)
* Over 20 mm
193 mm
14
Insert
Concrete