Configure And Setup After Device Replacement; Additional Information - IBM eserver Cluster 1350 Installation And Service Manual

Table of Contents

Advertisement

4. Disconnect the power cord from the Myrinet switch. This powers down the
5. Remove the rack-mount screws from the chassis; then remove the chassis from
6. Install the new chassis and fasten the rack-mount screws.
7. Connect the optical cables to the connectors on the switch.
8. Connect the power cord to the Myrinet switch. This powers up the switch.

Configure and setup after device replacement

The Myrinet switch automatically remaps all the PCI boards, so no manual
configuration is needed.
IBM Customer Support personnel will update the firmware if necessary.

Additional information

Additional installation and troubleshooting information is available online from
Myricom at the following URL: http://www.myri.com/scs/#documentation
68
IBM Eserver Cluster 1350 Installation and Service Guide
switch.
the rack.
Note: Save the dust caps for future use.

Advertisement

Table of Contents
loading

Table of Contents