Summary of Contents for Teknion district SUPPORT FOOT FOR DISTRICT FREESTANDING WITH GLASS PANEL ADD-ON
Page 1
Socket Cap Screw (E01-0757) x8 H - 5/16-18 x 1/2" Long Socket Set Screw, Flat Point (E01-0884) x2 I - Trim Fastener District/Leverage (D03-0065) x2 only used with Glass Panel Add-on Product shipped For Customer Support please contact fully assembled product.support@teknion.com...
Page 2
district Section: Date: Nov 2015 Page No: 2 of 9 Description: DIS_101g_G02 LOOSEN LEVELERS STEP 1: Lay Frame on the floor and loosen Levelers.
Page 3
district Section: Date: Nov 2015 Page No: 3 of 9 Description: DIS_101g_G03 REMOVE HARDWARE & FOOT STEP 2: Remove hardware and Foot as shown.
Page 4
district Section: Date: Nov 2015 Page No: 4 of 9 Description: DIS_101g_G04 ADJUST FOOT SUPPORT BRACKET WELDMENT LOCATION NOTE: Fasten with same Screws loosely. STEP 3: Remove Screws, slide in Foot Support Bracket Weldment one slot inward and fasten with same Screws loosely. Then fasten Foot Support Bracket Weldment to Frame as shown.
Page 5
district Section: Date: Nov 2015 Page No: 5 of 9 Description: DIS_101g_G05 INSTALL GLASS PANEL ADD-ON & FOOT WELDMENT Glass Panel Add-On Single Frame configuration Multiple Frames configuration NOTE: Make sure the end of Add-On Metal Sub-assembly is aligned with the end of Frame. STEP 4: Slide Trim Fasteners into the Add-On Metal Sub-assembly.
Page 6
district Section: Date: Nov 2015 Page No: 6 of 9 Description: DIS_101g_G06 ADJUST FOOT SUPPORT BRACKET FASTEN SCREWS LOOSELY NOTE: Make sure to keep Cap Screws loose for further adjustment. STEP 5: Make sure Foot Support Brackets are fully contact with Frame, then tighten Screws to STEP 6: Fasten Cap Screws to the Support Foot assembly loosely.
Page 7
district Section: Date: Nov 2015 Page No: 7 of 9 Description: DIS_101g_G07 ADJUST HEIGHT & HORIZONTAL LEVELING CHECK VERTICAL LEVELING 29" STEP 7: Make sure Frame is at 29" height and leveled. Adjust Levelers if necessary. STEP 8: Check if Frame is leveled vertically by putting leveler against Frame as shown. Continue with STEP 9 if adjustment is necessary.
Page 8
district Section: Date: Nov 2015 Page No: 8 of 9 Description: DIS_101g_G08 VERTICAL LEVELING (FORWARD) NOTE: 1) Finger tight 2 Cap Screws (1). 2) Adjust 2 Set Screws (2) until Frame is upright. 3) Tighten 2 Cap Screw (3). 4) Tighten 2 Cap Screw (1). STEP 9a: If Frame needs to be adjusted forward.
Page 9
district Section: Date: Nov 2015 Page No: 9 of 9 Description: DIS_101g_G09 VERTICAL LEVELING (BACKWARD) NOTE: 1) Finger tight 2 Cap Screws (1). 2) Adjust 2 Set Screws (2) until Frame is upright. 3) Tighten 2 Cap Screw (3). 4) Tighten 2 Cap Screw (1). STEP 9b: If Frame needs to be adjusted backward.
Need help?
Do you have a question about the district SUPPORT FOOT FOR DISTRICT FREESTANDING WITH GLASS PANEL ADD-ON and is the answer not in the manual?
Questions and answers