INSTALLATION REQUIREMENTS
Step 2:
As shown below, align the stacking kit to the left and right sides of the front load
washing machine.
Step 3:
Identify and drill 6 positioning holes of stacking kit on the top panel of washing
machine.
Drill Ø 3mm holes and fit the 6 × M4 Screws (C) to fix the stacking kit into the top
Step 4:
panel of washing machine. Please ensure that the torque is less than 10nm when
tightening.
33
Need help?
Do you have a question about the MLE27N4AWWC and is the answer not in the manual?
Questions and answers