Page 2
INSTALLATION INSTRUCTIONS VOLT Solar Integrated LED Path Light ® VSPL-1045-BBZ-R1 & VSPL-1045-PBK-R1 Important: Please Read Before Installation This luminaire is intended for installation in accordance with local codes and the National Electric Code (NEC). Failure to adhere to these codes and instructions may result in serious injury, property damage and void the warranty.
Page 3
Package Contents A. (1) Fixture Body B. (1) Battery Parts Required A. (1) Mounting Accessory B. (1) Riser Product Dimensions 8.68” 4.55” 7.57” customersupport@voltlighting.com • 813.978.3700 - 3 -...
Page 4
INSTALLATION INSTRUCTIONS VOLT Solar Integrated LED Path Light ® VSPL-1045-BBZ-R1 & VSPL-1045-PBK-R1 Remove Battery Compartment Cover Screw Using a screwdriver, remove the battery compartment Battery cover from the fixture body. Compartment Cover Fixture Body Install Battery Insert the battery into the battery Battery compartment.
Page 5
Test Solar Light Black Material Solar Panel On/Off Switch Fixture Body Slide the ON/OFF switch of the fixture to the “ON” position. Cover solar panels completely by using black materials. The fixture will light up when the solar panel is covered and turn back off when it is uncovered.
Page 6
INSTALLATION INSTRUCTIONS VOLT Solar Integrated LED Path Light ® VSPL-1045-BBZ-R1 & VSPL-1045-PBK-R1 Install Stake Determine the desired location Board for mounting the stake mount. Hammer the stake into the ground until flange of stake is flush to grade. To avoid...
Need help?
Do you have a question about the VSPL-1045-BBZ-R1 and is the answer not in the manual?
Questions and answers