Wiring And Sequence Of Operation - Haier GE NF96DV Service Manual

96% downflow two stage variable speed gas furnace
Hide thumbs Also See for GE NF96DV:
Table of Contents

Advertisement

Wiring and Sequence of Operation

NOTES:
1.
PRESS AND RELEASE FAULT CODE HISTORY BUTTON TO DISPLAY FAULT CODES. TO ERASE CODES, PRESS AND HOLD BUTTON
IN FOR MORE THAN 5 SECONDS
2.
IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE FURNACE MUST BE REPLACED, IT MUST BE REPLACED WITH WIRING
MATERIAL HAVING A TEMP. RATING OF AT LEAST 90°c.
3.
PROPER POLARITY MUST BE OBSERVED FOR FIELD LINE VOLTAGE SUPPLY; IGNITION CONTROL WILL LOCK OUT IF POLARITY
IS REVERSED.
4.
FOR TEMPORARY SERVICE REPLACEMENT OF CIRCULATING BLOWER MOTOR WITH PSC MOTOR, CONNECT DESIRED SPEED
TAP TO "EAC" TERMINAL AND NEUTRAL TAP TO NEUTRAL TERMINAL ON IGNITION CONTROL.
5.
DO NOT CONNECT C (COMMON) CONNECTION BETWEEN INDOOR UNIT AND THERMOSTAT EXCEPT WHEN REQUIRED BY THE
INDOOR THERMOSTAT. REFER TO THE THERMOSTAT INSTALLATION INSTRUCTIONS.
31-5000727 Rev. 0
Figure 49. Typical Wiring Diagram
Page 49

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GE NF96DV and is the answer not in the manual?

Questions and answers

Table of Contents