Joint Cementing Procedure - Haier GE NF96DV Service Manual

96% downflow two stage variable speed gas furnace
Hide thumbs Also See for GE NF96DV:
Table of Contents

Advertisement

VENT PIPE
NF96DV
DIA.
(in.)
1-1/2
1
2
070
2-1/2"
3
2
090
2-1/2"
3
2
110
2-1/2"
3
2 inch to 1-1/2 inch reducer required, must be field provided.
1
* Requires field-provided and installed 1-1/2" exhaust accelerator.
** Kit 51W11 is provided with a 1-1/2" accelerator, which must be used for all 70,000 furnace installations. When using 1-/2 in. piping,
the pipe must be transitioned to 2 in. pipe when used with the Flush Mount Kit.
† Termination kits 44W92 and 44W93 are approved for use in Canadian installations to meet CSAB149.
†† The 44W92 concentric kit is provided with a 1-1/2" accelerator, which must be installed on the exhaust outlet when this kit is used
with the 70,000 furnaces. When using 1-1/2 in. piping, the pipe must be transitioned to 2 in. pipe when used with the Concentric
Kit.

Joint Cementing Procedure

All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
1.
Measure and cut vent pipe to desired length.
2.
Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
NOTE: Check the inside of vent pipe thoroughly for
any obstruction that may alter furnace operation.
3.
Clean and dry surfaces to be joined.
4.
Test fit joint and mark depth of fitting on outside of pipe.
31-5000727 Rev. 0
STANDARD
Outdoor
Outdoor Exhaust
Exhaust
Accelerator
Accelerator
(Dia. X Length)
(Dia. X Length)
1-1/2" X 12"
2" X 12"
YES
YES
YES
YES
YES
YES
YES
YES
YES
Table 8. Outdoor Termination Kits
Flush
Mount
Concentric
Kit
51W11 *
+44W92++
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
5.
Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE: Time is critical at this stage. Do not allow
primer to dry before applying cement.
6.
Promptly apply solvent cement to end of pipe and
inside socket surface of fitting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
7.
Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn
during assembly (but not after pipe is fully inserted) to
distribute cement evenly. DO NOT turn ABS or cellular
core pipe.
NOTE: Assembly should be completed within 20
seconds after last application of cement. Hammer
blows should not be used when inserting pipe.
Page 19
CONCENTRIC
1-1/2"
2"
Concentric
Kit
Kit
71M80
69M29
or
or
+44W92++
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
3"
Concentric
Kit
60L46
or 44W93+
YES
YES
YES
YES
YES
YES

Advertisement

Table of Contents
loading

Table of Contents