Safety And System Checks; Disassembly - d&b audiotechnik SL Z5731 Rigging Manual

Hide thumbs Also See for SL Z5731:
Table of Contents

Advertisement

8
All manuals and user guides at all-guides.com

2.5 Safety and system checks

Recheck the actual status of the entire assembly as follows:
Mechanical setup
1. Ensure the stacking frame is properly secured against
2. Ensure the Locking pins of the front fixing support to the first
3. Ensure both Locking pins fixing the Splay link of the first
4. Ensure all Locking pins of the Front links of each cabinet are
5. Ensure the Splay links of each cabinet are fixed in the Tension
6. Check the splay angles and the attachment of the Splay links
7. Ensure the Front links of the uppermost cabinet are kept in their
Wiring
▪ When the amplifiers are wired and powered on, use their
▪ Alternatively check the wiring using the Array verification

2.6 Disassembly

NOTICE!
The same safety instructions apply.
To dismantle the groundstack, follow the assembly and setup
instructions in reverse order.
movement and possible tipping over using appropriate rachet
straps and fixing points.
cabinet are fully inserted and properly locked on both sides.
cabinet to the rear Splay link slot of the frame are fully inserted
and properly locked.
fully inserted and properly locked on both sides.
) with Locking pin [3] and that this pin is
mode hole (Þ
fully inserted and properly locked.
at the rear of the cabinets and ensure all Locking pins are fully
inserted and locked.
park positions.
System check functions or channel mute switches and a test
signal to check the correct operation and routing of all channels
and cabinets.
function in R1.
d&b Z5731 Rigging manual 1.1 en
Assembly/Disassembly

Advertisement

Table of Contents
loading

Table of Contents