Break-In Procedure - STM ROCKETBOX 2.0 User Manual

Advanced pre-roll packing & filling
Hide thumbs Also See for ROCKETBOX 2.0:
Table of Contents

Advertisement

BREAK-IN PROCEDURE

Thank you for being a valuable and loyal client
of STM. Our goal is to bring our customers the
very best in product quality and customer
service. We value your feedback and use it to
evaluate what to improve and/or update in
our existing product line.
The RocketBox™ uses a direct funneling
system to deliver contaminate-free material
into the selected pre-rolls when used properly.
The Top Tray funnels are directly inserted into
the opening of the pre-roll cones. This only
allows what is being fed onto the Top Tray to
enter the desired pre-rolls in the Bottom Tray.
PLEASE ADHERE TO THE RECOMMENDED
GUIDELINES TO BREAK-IN YOUR ROCKETBOX™
After setting up the RocketBox™, run the machine through
multiple cycles with each of your tray systems - empty and
unloaded. Watch for and remove any debris in-between the
trays and in the bottom of the shaker box. We take great care
to mitigate this during production, however, due to the intense
vibration some debris may appear.
After un-boxing and the initial dry runs are complete, you may
proceed with regular/normal use of the RocketBox™. Until the
machine has been ran for 400 hours, discard all materials
which have dropped inside the bottom of RocketBox™.
*Run time is located on the start screen.
After the RocketBox™ has ran for 400 hours you may reuse the
material that has been collected in the bottom of the shaker
box. Only use this product after visual inspection for debris has
been completed.
Visual inspection should always remain part of the
operation for quality control standards.
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ROCKETBOX 2.0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents