Canarm CJF - AC Series Installation And Maintenance Instructions Manual

Canarm CJF - AC Series Installation And Maintenance Instructions Manual

Canarm jet fan

Advertisement

Available languages

Available languages

Quick Links

CJF – AC/EC SERIES
CANARM JET FAN
INSTALLATION AND MAINTENANCE INSTRUCTIONS
READ AND SAVE THESE INSTRUCTIONS
Inspect all shipments carefully for damage. The purpose of this manual is to aid in the proper installation and
operation of the Canarm Jet Fan (CJF). These instructions are intended to supplement good general practices
and are not intended to overwrite local codes and ordinances.
IT IS THE RESPONSIBILITY OF THE PURCHASER TO ENSURE THAT THE INSTALLATION AND
MAINTENANCE OF THIS EQUIPMENT IS HANDLED BY QUALIFIED PERSONNEL.
Inspect all shipments carefully for damage. THE RECEIVER MUST NOTE ANY DAMAGE ON THE CARRIER'S
BILL OF LADING AND FILE A CLAIM IMMEDIATELY WITH THE FREIGHT COMPANY.
GENERAL SAFETY
1. The CJF units come prepared with motor electrical leads
extended in a liquid tight conduit & a side mounted box.
Motor leads will be marked. Wiring diagram provided.
2. All electrical work must be done in accordance with all
applicable electrical codes by a qualified electrician.
3. Do not install or operate this fan in an environment where combustible materials, gases, fumes, or heavy
moisture are present.
4. Caution: The unit contains rotating parts, electrical components and is heavy and ceiling mounted. Use
appropriate caution when installing and servicing it.
5. Before starting the unit, carefully remove the inlet guard, and ensure all parts are secure and that the wheel
rotates freely.
6. Check and tighten, where necessary all screws, nuts, bolts, etc. prior to starting the unit. (As some may
have loosened during shipping)
7. NOTE: Check and tighten all hardware after 2 days of initial operation.
8. Make sure there is no foreign debris in the fan compartment or lodged in the wheel itself.
9. Inspect electrical components prior to completing electrical connections. Make sure everything is tight and
free of damage that may have occurred during shipping.
10. Always wear appropriate safety equipment when installing or servicing the unit.
11. Please follow all applicable national, state/provincial and local codes. They will supersede this manual.
12. Failure to follow the safety instructions in this manual may cause serious injury or death due to electrical
shock, high speed rotating parts or falling weight.
CJF_AC_EC_Series_JULY 2021
Canarm Ltd. - Corporate Head Office
Tel: (613) 342-5424
www.CANARM.COM
2157 Parkedale Avenue, PO Box 367
Fax: (613) 342-8437
Brockville, Ontario Canada K6V 5V6
hvacsales@canarm.ca
Page 1 of 6
www.canarm.com

Advertisement

Table of Contents
loading

Summary of Contents for Canarm CJF - AC Series

  • Page 1 Inspect all shipments carefully for damage. The purpose of this manual is to aid in the proper installation and operation of the Canarm Jet Fan (CJF). These instructions are intended to supplement good general practices and are not intended to overwrite local codes and ordinances.
  • Page 2: Installation

    CJF - AC/EC SERIES CANARM JET FAN DIMENSIONS & COMPONENTS &89:;<= >9?@A?.B;<:;CAD E8CA@ " &A;=H? & #'()*+, *-.-/01 22.3/241 -.22/241 56.2/241 20.2-/241 -4.7/61 -2.22/241 -.3/241 #'()6*, 42.22/241 2*.3/241 0.2/51 26.-/241 5+.2/61 00.7/61 -3.22/241 0.-/61 INSTALLATION 1. Carefully remove the jet fan and associated parts from its crate.
  • Page 3 CJF - AC/EC SERIES CANARM JET FAN INSTALLATION CONTINUED !"#URE%&' !"#$%&'()*"+#$'*( !"#URE%(' ,"%,#"%&)*"&-')$'(. !67:CD==E&7:F>G:&?76@:&=A8.&The I7>GA8:8&F>DB@AB<&76A=J&F6E&;:& $6L:& ?76@:& 6I67@& and DJ:& A@& DJ:8&C>7&=AC@AB<K 6J&6&;6J:&C>7&=AC@AB<&@N:&DBA@& @>&A@J&F>DB@&=>?6@A>B +>DB@AB<&"6A=J /LA8&C>7&=AC@AB< %=:?@7A?6=&;>O 1>>8:B&;=>?LJ&C>7&JDII>7@ !"#URE%)' -')$&/#)%-0 !"#URE%*' 1'"'(.&2'#."#+&'(&3*4 ,7:I67:&?:A=AB<&F>DB@AB<& Provide a neoprene or =>?6@A>B&AB&68G6B?: rubber membrane between unit and ceiling when moun琀ng...
  • Page 4: Standard Wiring Diagram

    In the case of the ECsmart, if you are connecting a control cable (remote or local) make sure to use a proper water tight bushing in the control box side of the motor. See Figures 6 & 7 or contact Canarm Ltd. for more information. VARIABLE SPEED CONTROL The CJF with EC motor can be easily equipped with a variable speed control, or other 0-10v control system.
  • Page 5: Maintenance

    CJF - AC/EC SERIES CANARM JET FAN MAINTENANCE All maintenance and wiring should be completed by a qualified electrician in accordance with National & Local Electrical Codes. Ensure power supply is disconnected and that the unit is locked out prior to performing any work on the CJF.
  • Page 6: Fan Troubleshooting

    WARRANTY CANARM Ltd. warrants every new fan to be free of defects in material and workmanship to the extent that, within a period of one year from the date of purchase CANARM Ltd. shall either repair or replace at CANARM’s option, any unit or part thereof, returned freight prepaid and found to be defective.
  • Page 7: Sécurité Générale

    électrique, de pièces rotatives à grande vitesse ou d'une chute pesante. CJF_SÉRIES_AC_EC_JULLIET 2021 www.CANARM.COM Page 1 / 6 Canarm Ltd. - Siège Social 2157 Parkedale Avenue, PO Box 367 Brockville, Ontario Canada K6V 5V6 Tel: (613) 342-5424 Fax: (613) 342-8437 hvacsales@canarm.ca...
  • Page 8 CJF – SÉRIES AC/EC VENTILATEUR À JET CANARM DIMENSIONS ET COMPOSANTES "9>?@=A C9A?@=.DEF?GA@=HA=I 89:;<= " &=@LM? & #'()*+, *-.-/01 22.3/241 -.22/241 56.2/241 20.2-/241 -4.7/61 -2.22/241 -.3/241 #'()6*, 42.22/241 2*.3/241 0.2/51 26.-/241 5+.2/61 00.7/61 -3.22/241 0.-/61 INSTALLATION 1. Retirez doucement le ventilateur et ces pièces assorties de la boîte.
  • Page 9 CJF – SÉRIES AC/EC VENTILATEUR À JET CANARM INSTALLATION (SUITE) !"#URE%(' PRÉPAREZ À SOULEVER !"#URE%&' INFORMATION SUR LE CAISSON Retirez délicatement le couvercle du Démontez le caisson et caisson. Les rails de montages fournis utilisez-le comme base pour peuvent être utilisés comme leviers.
  • Page 10 Dans le cas de l'ECsmart, si vous connectez un câble de contrôle (distant ou local), assurez-vous d'utiliser une douille étanche appropriée du côté du boîtier de contrôle du moteur. Voir figures 6 et 7 ou contactez Canarm Ltd. Pour de plus CONTRÔLE DE VARIATION DE VITESSE amples informations.
  • Page 11: Entretien

    CJF – SÉRIES AC/EC VENTILATEUR À JET CANARM ENTRETIEN Tous les travaux d'entretien et de câblage doivent être effectués par un électricien qualifié conformément aux codes électriques nationaux et locaux. Assurez-vous que l'alimentation électrique est déconnectée et que l'unité est verrouillée avant d'effectuer tout travail sur le CJF.
  • Page 12: Garantie

    CANARM Ltd. Garantit que chaque nouvelle unité AP est exempte de défauts de matériaux et de fabrication dans la mesure où, dans un délai d'un an à compter de la date d'achat, CANARM Ltd. réparera ou remplacera au choix de CANARM’s, toute unité ou partie , fret retourné...

This manual is also suitable for:

Cjf - ec seriesCjf-50nCjf-85n

Table of Contents