Deleting One Or Several Periods From A Schedule; Deleting All Periods From A Schedule; Transferring A Period To Different Days; Select And Deselect Periods To Be Edited - Bosch Air Center Control User Manual

Central controller with touch display
Table of Contents

Advertisement

For the new period to be available in the system, the period must be set
via the Settings sidebar.
To cancel the operation:
▶ Select Cancel.
 13.3 "Selecting a schedule"
 13.10 "Settings sidebar, periods"
 13.1 "Overview Schedules"
13.6

Deleting one or several periods from a schedule

To delete one or several periods from a schedule:
▶ Select the schedule you wish to delete the period from.
▶ Select the period to be deleted in the View area.
▶ Select
in the View area.
▶ Select Confirm.
The period is deleted from the schedule.
To cancel the operation:
▶ Select Cancel.
 13.9 "Select and deselect periods to be edited"
 13.3 "Selecting a schedule"
 13.1 "Overview Schedules"
13.7

Deleting all periods from a schedule

To delete all periods from a schedule at the same time:
▶ Select the schedule from which you wish to delete all periods.
▶ Select Select all.
All periods of the schedule are selected.
▶ Select
.
▶ Select Confirm.
All periods are deleted from the schedule.
To cancel the operation:
▶ Select Cancel.
 13.3 "Selecting a schedule"
 13.9 "Select and deselect periods to be edited"
 13.1 "Overview Schedules"
Air Center Control – 6720892123 (2020/06)
13.8

Transferring a period to different days

Once a period has been set via the Settings sidebar, it can be transferred
from one day to other days.
To transfer one period (or a maximum of 3 periods):
▶ Select the period you wish to transfer.
▶ Select Copy to.
The Select day(s) list box is displayed.
▶ Select
next to the day(s) you want to transfer the selection to.
appears. The day(s) is (are) selected.
To close the list box and apply the selected days:
▶ Select the
symbol of the list box.
The list box closes. The period is transferred and appears in the View
area.
 13.10 "Settings sidebar, periods"
 13.9 "Select and deselect periods to be edited"
 13.1 "Overview Schedules"
13.9

Select and deselect periods to be edited

Periods can be operated in the same manner as units via the Schedules
page.
To operate periods individually (e.g. set Operating mode, Set
temperature), periods must have been selected beforehand in the View
area.
 13.1 "Overview Schedules"
 13.10 "Settings sidebar, periods"
 13.3 "Selecting a schedule"

13.9.1 Selecting one or several periods

To select one or several periods for editing:
▶ Select
for the periods you wish to edit.
appears. The periods are selected. The Settings sidebar appears.
 13.3 "Selecting a schedule"
 13.10 "Settings sidebar, periods"

13.9.2 Selecting all periods

To select all periods of a schedule you wish to edit:
▶ Select Select all.
appears. All periods are selected. The Settings sidebar appears.
 13.3 "Selecting a schedule"
 13.10 "Settings sidebar, periods"

13.9.3 Deselecting periods

To deselect selected periods:
▶ Select
to uncheck it.
appears. The period is deselected.
To deselect all selected periods:
▶ Select Select none.
appears. Periods are deselected.
 13.3 "Selecting a schedule"
Schedules
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acc mtAir center control acc mt

Table of Contents