Putting Into Service; Coupling And Uncoupling - KUHN EL82 Operator's Manual

Power tiller
Table of Contents

Advertisement

1. Coupling and uncoupling

Description of coupling elements
- A PTO shaft 1 3/8'' - 6 splines.
- A 3-point hitch.
Preparing the tractor
Models: 130 - 155 - 180
The machine adapts to tractors fitted with a 3-point hitch
coupler category 1N - 1 or 2.
Model: 205
The machine adapts to tractors fitted with a 3-point hitch
coupler category 1 or 2.
The tractor nominal PTO speed must be 540 min
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.
26

Putting into service

$Putting into service
-1
.
A
Power tiller
EL82
A

Advertisement

Table of Contents
loading

Table of Contents