Download Print this page

Eclipse RatioAir RA Series Manual page 9

Advertisement

ystem Design
SIGN
esign structure
he design process is divided into the following steps:
. Burner Option Selection including:
urner Model / Size Selection
uel Type
ir Supply
ombustor Type
ombustor Length
ontrol Motor
urner Configuration
as Pipe Connection
lame Supervision
ir Flow Switch
. Blower Option Selection including:
ower Supply Frequency
ressure & Flow
lower Motor Type
lower Inlet
otor Orientation
. Control Methodology including:
urner Control
. Ignition System including:
gnition T ransformer
rial For Ignition
gnition Gas Piping
. Flame Monitoring Control System including:
lame Sensor
lame Monitoring Control
. Main Gas Shut-Off Valve Train including:
omponent Selection
alve Train Size
clipse RatioAir v1 - Design Guide No. 115, 2/14/05
9

Advertisement

loading