Site Information - FireLake P77-3-SC30 Installation And Operator's Manual

Incinerator
Table of Contents

Advertisement

P
LACEMENT AND
• The incinerator is designed for indoor or outdoor installation on a concrete slab.
• For ease of operation and to protect the equipment we suggest the unit be
installed in a three or four sided shelter with roof. Allow service space to load
and unload and service the burners and controls.
to prevent the room from exceeding 130F. The shelter must comply with local
building and fire codes for clearances from combustible walls and materials. A
minimum clearance of 4' around the incinerator is recommended for service and
maintenance.
For recommended construction of a metal chimney through a combustible roof
see the "Combustible Roof Construction Diagram" in this manual.
Photo of unit on a concrete surface
Photo applies to P50 or P77 Main Chamber with SC30 Secondary Chamber
P77-3 SC30 Manual 9.27.2019

SITE INFORMATION

C
ONSTRUCTION RECOMMENDATIONS
Page 6
Allow ample cross ventilation

Advertisement

Table of Contents
loading

Table of Contents