Packing List - FireLake P77-3-SC30 Installation And Operator's Manual

Incinerator
Table of Contents

Advertisement

Note: Counter weight material is supplied by factory and placed in fill box at end of door arms.
Sand or gravel is typical and weight used should be tuned to allow a slow rise of the door and
remain open on its own.
This incinerator must be assembled and connected to utilities by persons qualified to assure
proper operation. The Operator must read this manual and understand the operation and safety
before attempting use. Ash must be routinely removed by persons using proper protective
clothing like masks and glove. Only qualified service people are to adjust controls or install
components. Qualified is one who is engaged in, responsible for, or thoroughly familiar with
the permitting, installation and operation of incineration appliances, who is experienced in such
work and is familiar with the precautions required, and who will comply with all the
requirements of the Authority having jurisdiction over the installation. Refer to details in this
manual for other information.
P77-3 SC30 Manual 9.27.2019

PACKING LIST

Primary Chamber Components
1
Primary Chamber w/ top & door assembly
including weight box with arms.
1
Connector Stack 3 foot tall, may be attached
to primary chamber
1
Toggle Clamp Ash door
3
Toggle Clamp Door
Stack Components
3
4' x 18" Painted Steel Lined Stack section with
coupler for thermocouple
1
18" Stainless Steel Stack Cap
1
Secondary Burn Chamber
Burner & Hardware Gas
1
Upper Burner Midco Gas Burner
2
Lower Burner Midco Gas Burner
3
Burner Cover
Control Box
1
Control Panel, includes one or more of any of
following to meet customer needs
Digital Timer
Digital Temperature Control
Chart Recorder (if ordered)
Lights, Switches, Breakers
Page 5

Advertisement

Table of Contents
loading

Table of Contents