FireLake P77-3-SC30 Installation And Operator's Manual page 50

Incinerator
Table of Contents

Advertisement

Curing of the refractory has been factory done.
refractory is added later it is essential to cure prior to
burning the first load of waste. See "REFRACTORY CURING
PROCEDURE" table.
1. Remove ashes before loading the incinerator.
2. Load incinerator. Keep the waste 6"-8" away from the burner port.
3. Start upper timer with desired hours time. Upper burner fires and preheat starts.
After preheat is satisfied start lower timer with desired hours time (starts lower burner).
4. The incinerator will automatically shut off when the upper timer ends.
5. For best results, burn daily to a white ash. Load waste near hot part of flame.
REFRACTORY CURING PROCEDURE
Curing creates hairline cracks, minor scaling of the refractory after
curing is complete. This is a normal result of the curing process.
P77-3 SC30 Manual 9.27.2019
Table 1: REFRACTORY CURING PROCEDURE
Procedure
Start burner and burn for
Allow to cool for
burn
cool
burn
cool
burn
cool
burn
cool
burn
cool
burn
cool
burn
cool
burn
cool
burn
cool
burn
Total Time
Page 50
Time
5 minutes
15 minutes
5 minutes
15 minutes
15 minutes
15 minutes
15 minutes
15 minutes
30 minutes
15 minutes
30 minutes
15 minutes
1 hour
15 minutes
1 hour
15 minutes
1 hour
15 minutes
2 hour
15 minutes
3 hours
12 hours(approximate)
If any new

Advertisement

Table of Contents
loading

Table of Contents