Assembly Instruction; Water Service - FireLake P77-3-SC30 Installation And Operator's Manual

Incinerator
Table of Contents

Advertisement

E
S
LECTRICAL
ERVICE
T
HIS INCINERATOR HAS BEEN BUILT TO OPERATE ON ONE OF THE FOLLOWING POWER SUPPLIES
N
115
EVER CONNECT A
115 volts, 60hz, 30 amp or 220 volts, 50hz, 15 amp for diesel units
115 volts, 60hz, 20 amp or 220 volts, 50hz, 10 amp for gas units
• Electrical service is to be field supplied to the standing control box on the
terminal strip as factory labels indicate.
• Have a Disconnect mounted near the Control Box.
• Unroll factory cables and attach labeled wires to smaller boxes on incinerator
where matching factory labels indicate.
• Note that burners fire only Fuel Oil or Gas, not interchangeable. Read the
section for your style burner.
W
S
ATER
ERVICE
A W
S
ATER
PRAY BOX IS FACTORY ATTACHED TO THE INCINERATOR
MUST BE FIELD INSTALLED TO THE CONNECTION ON THE
LINE MAY BE FLEX OR HARD PIPED OR A COMBINATION OF BOTH
WATER MUST BE A MINIMUM
P77-3 SC30 Manual 9.27.2019
D
A
ETAILED
SSEMBLY
220
V TO A
V SYSTEM OR A
P
ROTECT FROM FREEZING
60
0.8
PSI AT
GPM
I
NSTRUCTION
220
115
V TO
V SYSTEM
!
W
Q
ATER
UENCH
.
D
.
Page 13
.
. A
FRESH WATER LINE
S
. T
PRAY BOX
ELIVERY OF CLEAN FRESH
.
HIS

Advertisement

Table of Contents
loading

Table of Contents