Maintenance Schedule - FireLake P77-3-SC30 Installation And Operator's Manual

Incinerator
Table of Contents

Advertisement

DAILY
1.
Check burners for smooth ignition.
-
Check gas pressure before and during operation.
-
Check fuel tank level.
-
Clean inlet to fans, remove debris, bugs from burner housing area.
-
Keep unnecessary tools and materials from incinerator area.
-
Never store combustibles on or near the incinerator.
2.
Check primary chamber for wear.
-
Remove ash.
-
Check rope seals, replace as needed.
-
Check burner noses where possible to assure no debris has settled there.
WEEKLY
1. Check gas drip legs for moisture and debris, drain off.
2. Check oil filter for accumulation of water, rust, sludge, and replace as needed.
3. Check condition of hinges, pins on door weights.
4. Replace paper in chart recorder if one is being used.
MONTHLY
1. Check for gas or oil leaks in fittings.
2. Check for loosened bolts in chamber, stack, and loader.
3. Clean and repaint any worn areas before surfaces get corroded.
YEARLY
1. Disconnect power and fuel lines from burners.
2. Take burners to a work bench and examine for wear.
3. Replacing the head at the end of the burner tube, electrodes, & nozzles are common.
4. Clean the fan and inside of the burner. Use a mild abrasive cloth or wire to remove rust.
5. Replace battery in optional chart recorder.
P77-3 SC30 Manual 9.27.2019

MAINTENANCE SCHEDULE

Page 26

Advertisement

Table of Contents
loading

Table of Contents