Installing The Mezzanine Card; Ocp 3.0 - Gigabyte E263-Z30-AAD1 User Manual

Edge server – 2u up short depth amd epyc 9004 server system nvme/sata/sas
Hide thumbs Also See for E263-Z30-AAD1:
Table of Contents

Advertisement

3-7

Installing the Mezzanine Card

3-7-1 OCP 3.0

Use of the following type of OCP 3.0 NIC is recommended:
• OCP 3.0 SFF with Pull Tab
• OCP 3.0 SFF with Ejector Latch
Follow these instructions to install an OCP 3.0 mezzanine card:
1.
Remove the two screws securing the mezzanine card slot cover.
2.
Remove the slot cover from the system.
3.
Insert the OCP 3.0 mezzanine card into the card slot ensuring that the card is firmly connected to
the connector on the motherboard.
4.
Tighten the thumbnail screw to secure the OCP 3.0 mezzanine card in place.
5.
Reverse the previous steps to replace the OCP 3.0 mezzanine card.
1
2
1
3
4
System Hardware Installation
- 32 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

E263-z30

Table of Contents