Completing The Installation Procedure; Updating Firmware - HPE Smart Array P240nr User Manual

Table of Contents

Advertisement

Connect the Mini-SAS cables. Install the cables according to their labels as MINI-SAS 0 or
b.
MINI-SAS 1. The labels are on both the cables and their connections.
Install the air baffle.
14.
Install the access panel.
15.
Install the server into the chassis.
16.
Connect all peripheral cables to the server.
17.
Power up the server.
18.

Completing the installation procedure

Verify that all cables are routed correctly and are not restricting other components or being pinched
1.
by them. For the correct cable routing, see the compute module or server documentation.
Power up the compute module or server, if necessary.
2.
Update the firmware and drivers for the controller or adapter and the server or appliance.
3.

Updating firmware

Compute module or server and controller firmware should be updated before using the controller for the
first time, unless any installed software or components require an older version.
HPE Synergy
For information on driver and firmware updates to the HPE Synergy appliance, see Best Practices for
HPE Synergy Firmware and Driver Updates on the Hewlett Packard Enterprise website
(http://www.hpe.com/info/synergy-docs).
HPE Proliant servers
For system software and firmware updates, download the SPP from the Hewlett Packard Enterprise
website (http://www.hpe.com/info/spp/docs).
Installation 16

Advertisement

Table of Contents
loading

This manual is also suitable for:

H240nr smart hbaSmart array p542d

Table of Contents