7. Erect the Pedestal (B).
This must be carried out by two people, one of whom will tilt the pedestal
on one of the sides.
Method of connecting the pedestal to the concrete foundation
8. Make sure that the pedestal's base (K) is aligned with the mounting holes of the
foundation (D).
9. Insert M12 bolts (minimum length of the bolts is 35 mm) (I) fitted with washers (J) into
the holes (6x).
10. Tighten the bolts with a tightening torque of 10 Nm.
Document: v0.4 / Document No.: TBA | Date: 11-08-2021
HVC-R 100/150 E-Bus Charger Installation Guide
NOTICE
Page 84 of 131