ABB HVC-R 100 Installation Manual page 83

E-bus charger
Table of Contents

Advertisement

HVC-R 100/150 E-Bus Charger Installation Guide
Removing the pedestal's rear cover plate.
5. Carefully position the Pedestal (B) next to the foundation (D).
6. Pull the cables (E) through the opening (F).
Indication of the way the pedestal should be place on the foundation.
Document: v0.4 / Document No.: TBA | Date: 11-08-2021
Page 83 of 131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hvc-r 150

Table of Contents