baxiroca HF 90 Manual page 20

Low-temperature, cast-iron boilers and heating units
Table of Contents

Advertisement

Available languages

Available languages

BE CAREFUL TO ASSEMBLE THE MIDDLES SECTIONS CORRECTLY
Inside
Tightening of the
leaktightness cord
Tightening the Sections
To tighten the sections, a set of assembly bars is necessary
(fig. 7). It comprises:
For 4- to 7-section boilers:
- 2
assembly bars, 1.60m long
- 2
fixed plates with stop-ring
- 2
mobile plates with ball nut
- 1
nipple
wrench.
This set is not part of the standard supply.
Run =
Mobile plate
Nut
FRONT
N
b
. r
f o
e
e l
m
e
n
s t
4
a
7
8
a
9
20
Outsise
Assembly marking
(A)
(B)
(C)
Step =
B
r a
a r
L
I
i d
m
e
s n
o i
n
i d
m
e
s n
o i
n
A
1
6
0
0
1
3
5
5
A
+
D
2
2
5
0
2
3
0
5
For 8- to 9-section boilers:
-
The same previous assembly
-
2 assembly bars 950 mm long.
I max
assembly bar
Take alignment screws off
Leaktightness cord
junction point
Assembly marking
Place the cord in the
vertical element's
ream
Wooden block (provided)
Extension
Fixed plate
Fig.6
BACK
Stop-ring
Fig.7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hf 130Hf 170Hf 210Hf 250Hf 290

Table of Contents