Sensor Calibration (Conductivity); Calibration In Air (Zero Cal); Calibration In Air (Electric. Span); Calibration In The Process (Process Span) - Hach 3798-S sc User Manual

Digital inductive conductivity sensor
Table of Contents

Advertisement

5.6 Sensor calibration (conductivity)

5.6.1 Calibration in air (ZERO CAL)

5.6.2 Calibration in air (ELECTRIC. SPAN)

5.6.3 Calibration in the process (PROCESS SPAN)

The sensor has been permanently calibrated and operates with great enough
precision and stability that calibration is rarely necessary.
Calibrate the sensor
as required (measured value outside the permitted tolerance,
see Section
7.3 "Important service
in accordance or agreement with the authorities.
1. On the controller, open the menu SENSOR SETUP => CALIBRATE => ZERO
CAL and accept.
2. Remove the sensor from the tank, clean and dry.
3. Accept.
4. Wait until the controller displays CAL COMPLETE.
5. Confirm that you have replaced the sensor in the sample flow and accept.
1. Remove the probe from the flow of sample, clean and dry.
2. Connect a defined resistance (in range 5 Ohms - 5 kOhms) and accept to
continue.
3. Enter the value for the resistance and accept.
4. Wait until the value has stabilised.
5. Accept the value.
6. Replace the probe in the flow of sample and accept.
1. Hold the cleaned probe in the solution and accept to continue.
2. Accept when the measured value has stabilised.
3. Enter the value and accept.
4. Replace the probe in the flow of sample and accept.
Note: It is recommended to calibrate in the same conditions as later measurements
(temperature and conductivity level).
data") or
Operation
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lxv428.99.00001

Table of Contents