Grundfos DME 60 AR Installation And Operating Instructions Manual page 37

Table of Contents

Advertisement

Pos.
Description
6
Valve on suction side
7
Screws
8
Dosing head front plate (only PP, PVDF)
9
Drain opening
8.3.2 Dismantling the diaphragm and valves
Before dismantling, read section Diaphragm
breakage and section Operation with loose dosing
head screws thoroughly.
Warning
Danger of explosion, if dosing liquid has
entered the pump housing!
If the diaphragm is possibly damaged or if
the pump was operated with damaged or
loose dosing head screws, don't connect
the pump to the power supply!
This section refers to fig. Dosing head, exploded
view.
1. Make system pressureless.
2. Empty the dosing head before maintenance and
flush it, if necessary.
3. Take suitable steps to ensure that the returning
liquid is safely collected.
4. Dismantle suction, pressure and deaeration
hoses.
5. Unscrew deaeration valve.
6. Dismantle valves on suction and discharge side
(4, 6).
7. Loosen screws (7) on the dosing head (5).
8. Remove the screws, in case of PP or PVDF
dosing head together with the front plate (8).
9. Remove the dosing head (5).
10. Unscrew diaphragm (3) counter-clockwise and
remove it.
11. Make sure the drain opening (9) is not blocked or
soiled. Clean if necessary.
12. Check the safety diaphragm (1) for wear and
damage.
If nothing indicates that dosing liquid has entered the
pump housing, and if the safety diaphragm is not
worn or damaged, go on as described in section
Reassembling the diaphragm and valves. Otherwise
proceed as described in section Dosing liquid in the
pump housing.
Related information
1.7 Operation with loose dosing head screws
8.3.1 Dosing head overview
8.3.3 Reassembling the diaphragm and valves
8.4 Diaphragm breakage
8.4.1 Dosing liquid in the pump housing
8.3.3 Reassembling the diaphragm and valves
Please observe as well sections
Installation, Priming/venting of pump and
Caution
Start-up!
The pump must only be reassembled, if nothing
indicates that dosing liquid has entered the pump
housing. Otherwise proceed as described in section
Dosing liquid in the pump housing.
This section refers to fig. Dosing head, exploded
view.
1. Screw on new diaphragm (3) clockwise.
2. Attach the dosing head (5).
3. Install screws (7), in case of PP or PVDF dosing
head together with the front plate (8), and cross-
tighten with a torque wrench.
Torque: 5.5 Nm (+0.5 / -0 Nm).
4. Install new valves (4, 6).
Observe the flow direction (indicated by an
arrow on the valve)!
5. Install the deaeration valve.
6. Connect suction, pressure and deaeration hoses.
Cross-tighten the dosing head screws
with a torque wrench once before
commissioning and again after 2-5
Caution
operating hours at 5.5 Nm (+0.5 / -0
Nm).
7. Deaerate dosing pump (see section Priming/
venting of pump)
Related information
4.1 Safety instructions
5.3 Priming/venting of pump
6. Start-up
8.3.1 Dosing head overview
8.4.1 Dosing liquid in the pump housing
37

Advertisement

Table of Contents
loading

Table of Contents