Neptronic TM100N Specification & Installation Instructions

Neptronic TM100N Specification & Installation Instructions

Advertisement

Quick Links

Technical Data

Auxiliary switches
Fail safe - Enerdrive
Power consumption
Torque
Running time
through 90º
Power supply
Feedback
Electrical
connection
Inlet bushing
Control signal
Angle of rotation
Direction of rotation
Operating
temperature
Storage temperature
Relative Humidity
Weight
Dimensions
Caution
We strongly recommend that all Neptronic
prevent interference with, and/or possible damage to incompatible equipment.
When multiple actuators are wired on a single transformer, polarity must be observed. Long wiring runs create voltage drop which may affect the actuator performance.
1
Enerdrive SystemU.S.A. Patent #5,278,454
TM1N-RM1N_211213

Features:

TM100N
TM120N
No
Yes (2)
No
20 VA
180 in.lb. [20 Nm] at rated voltage
Analog, Digital or PWM programmable (factory set with analog control signal)
0 to 90 degrees, electronically adjustable (factory set with 90º stroke)
Reversible, Clockwise (CW) or Counterclockwise (CCW) (factory set with CW direction)
5 lbs. [2.3 kg]
Warning: Do not press the clutch when actuator is powered
®
products be wired to a separate transformer and that transformer shall service only Neptronic
Specification & Installation Instructions
Clutch for manual adjustments.
Maintenance free.
Position indicator.
Control signal fully programmable.
Brushless DC driven motor.
Fail safe by EnerdriveSystem
(on model 160 & 180).
Auxiliary switches
(on model 120 & 180).
TM160N
RM100N
No
No
Yes
45 VA Peak, 20
VA
40 to 50 sec torque dependant
28 to 32 Vdc or 22 to 26 Vac, 110 to 130 Vac 50/60Hz
4 to 20 mA or 2 to 10 Vdc adjustable
2
18 AWG [0.8 mm
] minimum
2 inlet bushing of 7/8 in [22.2 mm]
0ºF to 122ºF [-18ºC to 50ºC]
-22ºF to 122ºF [-30ºC to 50ºC]
5 to 95 % non condensing.
1
RM120N
RM160N
Yes (2)
No
No
30 VA
50 VA Peak, 30 VA
360 in.lb. [40 Nm] at rated voltage
8 lbs. [3.5 kg]
Dimension
Imperial (in)
A
5.20
B
1.33
C
9.13
D
3.55
®
Actuator
TM100N
TM120N
TM160N
RM100N
RM120N
RM160N
RM180N
RM180N
Yes (2)
Yes
Metric (mm)
132.1
33.8
231.9
90.2
products. This precaution will
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TM100N and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Neptronic TM100N

  • Page 1 ® ® We strongly recommend that all Neptronic products be wired to a separate transformer and that transformer shall service only Neptronic products. This precaution will prevent interference with, and/or possible damage to incompatible equipment. When multiple actuators are wired on a single transformer, polarity must be observed. Long wiring runs create voltage drop which may affect the actuator performance.
  • Page 2 TM100/120/160N RM100/120/160/180N Specification & Installation Instruction Mechanical Installation Manually close the damper blades and positioned the actuator at 0º or 90º. Slide the actuator onto the shaft. Tighten the nuts on the “U” bolt to the shaft with a 10mm wrench to a torque of 150 in.lb.
  • Page 3 TM100/120/160N RM100/120/160/180N Specification & Installation Instruction PC Board Dip switch settings Potentiometer Transformer cut out Pins for PWM selection Microcontroller Clutch Rotation: CW Fuse Fail safe return at 0º Input in Vdc Feedback in mA Reset button Terminal Default Setting = All dipswitches at OFF Dip switch 1 2 3 4 Line voltage terminal...
  • Page 4 TM100/120/160N RM100/120/160/180N Specification & Installation Instruction Zero and span calibration This feature is applicable to analog control signal only. Remove power and put all dip switches "OFF". (factory preset). Apply power and, within 10 seconds press and hold the reset button until the LED blinks once. The Zero and span calibration process then start.

This manual is also suitable for:

Tm120nTm160nRm100nRm120nRm160nRm180n

Table of Contents