RElOCATION
Transport, Installation, Start-up
R300
LR1802.10081 - 06.11.2014
Relocation
Only for Machines Equipped With Chip Conveyor
Unscrew the coolant hose from the screw connection above the coolant tank and
loosen the power line connections to the chip conveyor's coolant motor and drive
motor.
Pull out the chip conveyor and clean it.
Only for Machines Equipped With Blank Feeder
Disconnect the energy supplies, and close the connections, if applicable.
For transport by air, all accumulators attached to the machine
must be depressurized by a specialist.
Provide the appropriate transport gear for the feeder.
Replace the filling and venting filters with plugs.
35