Gas Piping And Gas Loop Piping Installation - Continental Girbau L28STK30G Owner's Manual

30 lb. stack laundry dryer gas
Table of Contents

Advertisement

GAS PIPING
INSTALLATION
Gas Piping Installation
1. The installation must conform with local codes, or in the
absence of local codes with the National Fuel Gas Code,
ANSI Z223.1 or the CAN/CGA-B149, Installation Codes.
2. Check identification nameplate for type of gas for dryer.
3. Check the altitude of dryer.
4. Check with utilities company for proper gas pressure and gas
supply line.
5. Natural gas only—check the gas pressure inlet supply to
dryer, 10.5 inches water column (26.2 mbar) maximum.
Manifold pressure—3.5 inches water column (8.8 mbar)
pressure.
6. L.P. gas only—check the gas pressure inlet supply to dryer,
13 inches water column (32.4 mbar) maximun. Manifold
pressure—10.2 inches water column (25.4 mbar) pressure.
7. A minimum 1/8 - inch NPT plugged tapping, accessible for
tests gage connection, must be installed immediately upstream
of the gas supply connection to the dryer.
CAUTION: Low gas pressure and intermittent gas will
cause gas ignition problems and inadequate drying of
laundry.
Page 14

Advertisement

Table of Contents
loading

Table of Contents