Download Print this page

Kohler COMPOSED K-25421T Installation Instructions Manual page 6

Advertisement

Install the Tubing (Recommended)
- Connect a straight PVC tube to the mounting bracket as
shown. Verify that the tube is long enough to reach the
control box.
- Connect a 90 degree elbow at the end of the PVC tube
at the control box installation location.
- Remove the plaster guard.
- Reinstall the plaster guard over the mounting pin.
- Finish the wall with a 1-1/4" (32 mm) hole for the spout,
cables and tubing.
Prepare the Spout
LED Assembly
Cable
LED组件电缆
- For ease when routing the cables and tubes, use electrical
tape to secure one of the cables to one of the tubes.
Repeat for the remaining cable and tube.
- Route the cables and tubes though the escutcheon to
install the escutcheon onto the spout.
1434862-T01-D
Plaster
Guard
护管
Sensor Cable
感应器电缆
Plastic Tube
塑料管
Plastic Tube
塑料管
安装导管(推荐)
1-1/2" ID
PVC Tubing
1-1/2"内径
1-1/4" OD
PVC Tubing
PVC管
- 将一段直的PVC管连接到支架上, 如图所示。 确保导管的长度足以
连接至控制盒。
- 在位于控制盒安装位置的PVC管末端连接一个90°的弯头。
- 卸下护管。
- 将护管重新安装在安装销上。
- 在墙壁上钻取一个1-1/4" (32 mm)的喷嘴孔、 电缆和导管孔。
准备龙头
- 为便于电缆和导管的布线, 使用电工胶带将其中一根电缆固定到其
中一根导管上,对剩余的电缆和套管重复该步骤。
- 将电缆和导管穿过底座, 然后将底座安装到龙头上。

Advertisement

loading

This manual is also suitable for:

Composed k-ex25421t