Download Print this page

Eaton R-Frame Series Installation Instructions Manual page 3

Shunt trip for c circuit breakers and molded case switches

Advertisement

Installation Instructions for Shunt Trip for
R-Frame Series C Circuit Breakers and
Molded Case Switches
THE VOLTAGES IN ENERGIZED EQUIPMENT CAN
CAUSE DEATH OR SEVERE PERSONAL INJURY.
SPECIAL ATTENTION SHOULD BE PAID TO
REVERSE FEED APPLICATIONS TO ENSURE NO
VOLTAGE IS PRESENT. BEFORE MOUNTING THE
SHUNT TRIP IN A CIRCUIT BREAKER INSTALLED
IN AN ELECTRICAL SYSTEM, MAKE SURE THE CIR-
CUIT BREAKER IS SWITCHED TO
TION AND THERE IS NO VOLTAGE PRESENT
WHERE WORK IS TO BE PERFORMED.
Note: Internal accessories are most easily installed
a
in
circuit breaker before it is mounted in an elect-
ri cal system.Although it is recommended that a cir-
cuit breaker mountedin an electricalsystem be rem-
oved to install accessories, it is possible to perform
this task in a mounted circuit breaker provided no
voltage is present and proper safety precautions
are followed.
2-1. Switch circuit breaker to OFF position.
Note:To install accessory, circuit breaker must be
in tripped position.
Device
Label
I
Fig. 2-1 Shunt Trip Kit.
WARNING
THE
OFF POSI-
i
.
,
,
I
Leads
o
Press Push-to-Trip button to trip operating mecha-
2-2.
nism.
Remove cover screws and cover.
2-3.
2-4. Install shunt trip as described in following steps:
Note: For ease of installation auxiliary switch acces-
sories (if used) should be installed in the accessory
mounting deck before the shunt trip or other acces-
sories.
a. Select position for shunt trip on accessory mounting
deck (see Fig 2-2).
b. Place legs of shunt trip mounting bracket into slots in
accessory mounting deck.
c. Slide the shunt trip toward the line end of the circuit
breaker until the retaining clip snaps into recess in
deck (see Fig. 2-3).
If installing more than one shunt trip, attach a num-
2-5.
bered wire marking label to each set of leads.
Labels marked
the installation of up to the maximum of two shunt
trips.
PIGTAIL LEADS COULD BE DAMAGED IF IN CON-
TACT WITH MOVING PARTS. PIGTAIL LEADS
SHOULD BE FORMED AND ROUTED TO CLEAR ALL
MOVING PARTS WHEN ACCESSORY IS PROPERLY
INSTALLED.
Attach cable tie mounting pad to side of circuit
2-6.
breaker (See Fig. 2-4 for location). Route leads to
mounting pad. Ensure leads line up with slot in
cover and are clear of all moving parts. Secure
leads to mounting pad with cable tie. Leads from
multiple accessories may be secured by a single
cable tie and mounting pad (see Fig.
Remove barrier indicated in Fig. 2-4 from cover
2-7.
accessory lead slot.
I
WHEN CHECKING ACCESSORY, DO NOT PUT FIN-
Tie
GERS NEAR MOVING PARTS INSIDE THE CIRCUIT
BREAKER CASE. SPRINGS CAUSE INTERNAL
PARTS TO MOVE QUICKLY AND WITH FORCE. CON-
TACT WITH MOVING PARTS CAN CAUSE INJURY.
Instruction Leaflet IL29C150G
Effective December 2011
and "2" are provided to allow for
CAUTION
2-3).
WARNING
EATON CORPORATION www.eaton.com
3

Advertisement

loading