Step
Action
Remove power from all DC connections to be installed.
3.
Turn off circuit breakers and remove fuses.
Verify with a Volt meter.
4.
Turn OFF circuit breakers assigned to this frame and verify with an volt meter
Open the distribution panel door on the right end of the shelf.
5.
Page 17
© Copyright 2021 ABB. All rights reserved.