120 Vac Refrigerant Pump Style Oil  Pump Installation; Installation Of Oil Pump Motor Wiring And Terminals - Trane Symbio CVRF Installation Instructions Manual

Chiller controller retrofit replacement panel ucp2
Hide thumbs Also See for Symbio CVRF:
Table of Contents

Advertisement

Installation
120 Vac Refrigerant Pump Style Oil 
Pump Installation
1. Remove start capacitor from oil pump motor junction box
and discard. This will not be used in this application.
2. Install new wire of same gauge as existing from control
panel to oil pump.
Figure 43. Refrigerant oil pump wiring, ref. 50712738
Installation of Oil Pump
Motor Wiring and Terminals
The CVRF installation will relocate the oil pump relay to the
control panel. Follow the below steps for installation.
1. Disconnect conduit from terminal box and disconnect
Seal-Tite® fitting from conduit.
2. Use fish tape to thread wire through conduit for the new
relay location in the control panel.
3. Remove and discard existing relay from oil pump junction
box.
4. Remove the backing to expose the adhesive on the
insulator (GKT04571 included with kit), and then install the
insulator over the Fusite pins.
32
3. Remove starter relay start capacitor and oil pump fuse from
the Symbio™ panel and discard. Replace these items with
the larger capacity relay, capacitor and fuse provided with
the kit.
4. Wire oil pump terminal box from terminals 1X1-15, 1X1-16
and 1X1-6 per schematic.
5. Attach Term-Lok adapters (KIT07955 included with kit))
and wire per schematic.
CVRF-SVN005C-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents