Figure 3.
Typical UCP2 before retrofit

Removal of Existing Panel

Remove the existing UCP2 panel. The existing brackets on the
chiller will be reused to mount the new control panel.

Installation of New Control Panel

Install the new control panel using existing hardware to mount
it to the UCP2 brackets.

Wiring Installation

WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury. 
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state/national electrical codes.
Unless otherwise indicated, all 115 volt control circuits use, as
a minimum, #16 AWG, 600 volt wire. Be sure to use existing
conduit wherever possible and separate all 115V wiring from
any low voltage circuits.
Most wiring will use the existing wires removed and marked
from the original panel and moved to the terminal block in the
new panel. Some wires may need to be connected directly on
a LLID terminal.
Table 6, p. 13
details the "before and after" of wires from the original panel to
the new panel. Also refer to the connection and schematic
diagrams listed in
"Wiring Diagram Matrix," p. 46
detail.
CVRF-SVN005C-EN
Stepper Module
(1U3)
Option Module
(1U5) (Optional)
Digit 6
Circuit Module (1U2)
Chiller Module (1U1)
for additional
For 50 Hz applications, the control power transformer (1T1) is
supplied as a 60 Hz application. To convert from 60 Hz to 50
Hz, the following step must be performed: move wire 2H from
H3 on 1T1 to H2.
If you have wired a temporary thermostat and 115 Vac power
source to the oil heater leads, wait to connect these wires until
the Tracer® AdaptiView™ retrofit is complete to avoid too
much cooling of the oil.
The information in
Table 6, p. 13
that exited the old control panel is to be rewired in the new
factory panel. Also refer to the connection and schematic
diagrams listed in
"Wiring Diagram Matrix," p.
Table 6.
Field wiring cross reference, UCP2 to new
panel
Existing
From
Wire #
(in Existing Panel)
P5A
1U1 J3-1
P5A
1U1 J3-2
P5B
1U1 J5-3
P5B
1U1 J5-4
Black
1U2 J3-1
White
1U2 J3-3
Green
1U2 J3-5
Red
1U2 J3-6
1U1 J14-1
5K2 Neutral
1U1 J12-1
5K1 Neutral
42A
1U2 J20-1
2N
1TB1-4
2M
4B3-2
9B/19A
1U2 J22-1
1TB1-10
1TB1-11
1TB1-12
1TB1-13
Starter Panel Ground 1X1-G
2TB1-1 (1TB1-1)
2TB1-2 (1TB1-2)
Installation
describes where the wiring
46.
To
(in New
Description or
Panel)
Comments
1A13 J2-1
External Auto/Stop
1A13 J2-2
External Auto/Stop
1A13 J2-3
Emergency stop
1A13 J2-4
Emergency stop
Motor winding temp
1A26 J2-1
sensor
Motor winding temp
1A26 J2-2
sensor
Motor winding temp
1A26 J2-3
sensor
Motor winding temp
1A26 J2-4
sensor
Condenser water pump
1A5 J2-1
relay 5K2 coil
Condenser water pump
Open neutral
relay 5K2 neutral
1A5 J2-4
Evap water pump relay
Evap water pump relay
Open neutral
neutral
1X1-22
Oil Heater 4HR1
1X1-8
Oil Heater 4HR1 Neutral
Oil pump motor (4B3)
1X1-7
neutral
1X1-16
to 4K8 oil pump relay
1X1-4
to 5K1, 5S2 flow switches
1X1-4
to 5K2, 5S3 flow switches
from 5K1, 5S2 flow
1X1-19
switches
from 5K2, 5S3 flow
1X1-20
switches
Panel ground (from
starter)
120 Vac power to control
1X1-1
panel from starter 2TB1-
1
120 Vac neutral to control
1X1-6
panel from starter 2TB1-
2