Download Print this page
Goodwe CT90 User Manual

Goodwe CT90 User Manual

Power limit solution for grid-tied pv inverters

Advertisement

Quick Links

User Manual
Power Limit Solution for Grid-Tied PV Inverters
V1.0-2022-09-15
1
Safety Precaution
General Safety
• The information in this user manual is subject to change due to product updates or other reasons. This guide cannot replace
the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions in the manual are for
guidance only.
• Before installations, read through the corresponding user manual to learn about the product and the precautions. Strictly follow
its requirements.
• All installations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety
regulations.
• Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear
anti-static gloves, cloths, and wrist strips when touching electron devices to protect the inverter from damage.
• Strictly follow the installation, operation, and configuration instructions in this manual. The manufacturer shall not be liable for
equipment damage or personal injury if you do not follow the instructions.
System Safety
1. Power off the equipment in the system before operations and maintenance. Otherwise, the equipment may be damaged or
electric shocks may occur.
2. The installation, electrical connection, and commissioning of the inverter, smart meter, communication box and other devices
in the system are not mentioned in this document. Please refer to the related user manual from the official website:
en.goodwe.com/
2
Networking
Matching Table
Product
DNS Series
XS Series
MS Series
NS Series
SDT G2 Series
SMT Series
MT Series
HV 1100 Series
Note
The load current shall be
• For some inverter series, the power limit function is not available. Please contact After-sales Service if needed.
• In networking systems with GM3000C + EzLogger Pro, or SEC1000, the power limit function can be fulfilled for multiple inverters
in parallel.
• In networking systems with CT90, GM3000 or HK3000, it is only able to realize power limit function for single inverter.
CT90
GM3000
O
O
O
O
×
×
×
×
The load current of each phase shall be
less than 90A.
NOTICE
WARNING
HK3000
×
×
×
×
×
×
×
×
O
O
O
O
O
×
×
×
less than 120A.
GM3000C
SEC1000
×
×
×
×
O
O
O
O
The load current of any phase shall be more
than 120A.
https://
×
×
×
×
O
O
O
O

Advertisement

loading
Need help?

Need help?

Do you have a question about the CT90 and is the answer not in the manual?

Questions and answers

Summary of Contents for Goodwe CT90

  • Page 1 • In networking systems with GM3000C + EzLogger Pro, or SEC1000, the power limit function can be fulfilled for multiple inverters in parallel. • In networking systems with CT90, GM3000 or HK3000, it is only able to realize power limit function for single inverter.
  • Page 2: Parts Description

    CT90 You can purchase CT from GoodWe with a standard length of 5 meters. Or select one with 30 meters in length. The cable length of CT depends on the actual distance between the inverter and the entry point of the distribution board.
  • Page 3 GM3000 Select whether to use GM3000 smart meter according to the maximum over current, the cables or the copper busbar in the system. For details, please consult GoodWe Solar Academy for help. CT is delivered with the smart meter. Load The load current of each phase shall be less than 120A.
  • Page 4 HK3000 Select whether to use HK3000 smart meter according to the maximum over current, the cables or the copper busbar in the system. For details, please consult GoodWe Solar Academy for help. CT is delivered with the smart meter. Load The load current of each phase shall be less than 120A.
  • Page 5 Power Limit Solution for Grid-Tied PV Inverters User Manual V1.0-2022-09-15 2.4 Three-Phase Inverter + GM3000C Networking System with Single Inverter GM3000C Inverter PV String Utility Grid Meter External CT Load Parts Description Parts Description Inverter Applicable inverters are SDT G2 series, SMT series, MT series and HT 1100V series. GM3000C Prepare CT by yourself for external installation when selecting 3000C smart meter.
  • Page 6 Power Limit Solution for Grid-Tied PV Inverters User Manual V1.0-2022-09-15 System with Multiple Inverters Monitoring Router System GM3000C Utility Grid Inverter N Meter Inverter I External CT Load Parts Description Parts Description Inverter Applicable inverters are SDT G2 series, SMT series, MT series and HT 1100V series. GM3000C Prepare CT by yourself for external installation when selecting 3000C smart meter in networking.CT Specification:...
  • Page 7 Power Limit Solution for Grid-Tied PV Inverters User Manual V1.0-2022-09-15 2.5 Three-Phase Inverter + SEC1000 Networking Inverter I PV String Utility Grid Transformer RS485 PV String Inverter II RS485 Router Monitoring System SEC1000 PV String Inverter N Parts Description Parts Description Inverter •...
  • Page 8: Parameter Setting

    Power Limit Solution for Grid-Tied PV Inverters User Manual V1.0-2022-09-15 Wiring Description WARNING 1. Connect SEC1000 AC cable to a 3L/N/PE Grid. The voltage of the Grid shall be within allowable voltage sampling scope of SEC1000. 2. The place to snap fit the CT shall be near the Grid-Tied entry point. Make sure the connecting direction is right. If CT is installed reversely, it is unable to realize the power limit function.
  • Page 9 • For more details, refer to the SolarGo APP User Manual. Visit https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_ SolarGo_User%20Manual-EN.pdf or scan below QR to get the user manual.
  • Page 10 • For more details, refer to SEC1000 User Manual. Visit https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_SEC1000_ User%20Manual-EN.pdf or scan below QR to get the user manual. • For more details, refer to EzLogger Pro User Manual.
  • Page 11 Power Limit Solution for Grid-Tied PV Inverters User Manual V1.0-2022-09-15 Parameter Setting (for Dynamic IP Mode) Step 1 SEC1000 is in the dynamic IP mode as default. Connect the SEC1000 NET port to the Router LAN port with the network cable. (Press RELOAD button for about 4 seconds, and the EzLogger Pro inside of SEC1000 is reset and switched to dynamic IP mode.) Step 2 Connect the computer to the Router network for communication.
  • Page 12: Troubleshooting

    10 minutes and then become standby. If it is disconnected with the smart meter, the inverters are able to run based on the setting power limit percentage. GoodWe Technologies Co.,Ltd. No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com...

This manual is also suitable for:

Gm3000Hk3000Gm3000cSec1000