Page 2
SEC1000 C&I 1. The SEC1000 2. How to set up the EzLoggerPro 3. How to upgrade the firmware 4. Checks 5. Diagrams Data may change without prior notice...
Page 3
1.1 The SEC1000 Functions • Monitoring up to 60 inverters • Export power limit function SEC1000 equipped with: • Load monitoring • IP65 cover • Reactive power control • AC switch • Massive update of FW • EzLoggerPro • Setup using SW Promate •...
Page 4
1.2 The SEC1000 1. IP65 Cover 2. AC switch 3. EzLoggerPro 4. 3-pase meter 5. CT terminal (X/5 A) AC Line RS485 (Reserved) Ethernet Current transformer (X/5 A) Data may change without prior notice...
Page 5
1.3 The SEC1000: current transformers • Current Transformers (CTs) are not included in the SEC1000 • CTs must be appropriate to the electrical installation where they will be installed • They must be installed in an ideal location to record the import/export flow •...
Page 6
2.1 Set up EzLoggerPro: Software Promate • Download the Promate software from goodWe's website: www.goodwe.com/downloads.asp Data may change without prior notice...
Page 7
2.2 Set up EzLoggerPro: Ethernet connection Set up your computer (PC) • Connect an Ethernet cable to your laptop and The EzLoggerPro Ethernet port • Set up your computer's Ethernet connection before using Promate software Data may change without prior notice...
Page 8
2.3 Set up EzLoggerPro (I) SEC1000 • Make sure your computer's Ethernet connection is set up correctly You need: • Computer • LAN Cable • Reset Software Promate (available on the web) Steps: Connect the computer to the Ethernet port of the EzLoggerPro Press the "Reset"...
Page 9
2.4 Set up EzLoggerPro (II) Confirm version FW Confirm status Confim Confim Step 1: Step 2: Step 3: • Check the connection status with the equipment • Activate the corresponding COM port • Refresh the list of inverters • Connection Succeeds: correct •...
Page 10
2.5 Set up EzLoggerPro (III) Step 4a: • Click on the "Export Enab" box Step 4b: Step 4c: Example "CT Ratio" of Transformer 250/5A • Indicate the power of the PV system in the "Total Capacity" field • Indicate the ratio of the current transformer installed •...
Page 11
• Proceed according to IP connection type: static (5A) or dynamic (5B) LED sequence, if IP Dynamic Step 6: • Disconnect the computer from the SEC1000 • Connect the router cable to the ethernet port of the EzLoggerPro Dynamic IP...
Page 12
• In order to be able to display the consumption and meter curves, the firmware (FW) of the EzLoggerPro must be upgraded, using a USB memory stick. • If necessary, you must update the SEC1000 using a USB stick. AC switch...
Page 13
4.1 Check the SEMS Portal • The SEC1000 must be added to the FV plant in SEMS next to the inverter(s). • The correct display in the SEMS Portal must be checked. Steps: Confirm that the SEC1000 has been added to the plant correctly •...
Page 14
4.2 Check the CT • The correct setting, location and direction of the current transformers (CT) should be checked • CTs must be installed near the meter. Checking the displayed real time data: Example "CT Ratio" of Transformer 250/5A 1. Turn OFF the PV system 50 ...
Page 15
4.3 Check the CT • The correct setting, location and direction of the current transformers (CT) must be checked • CTs must be installed near the meter. Main breaker. Main breaker. Meter Meter AC Switch AC Switch … … Line 1 Line 2 Line 3 PV System...
Page 16
4.4 Check the RS485 connection SEC1000 • The correct installation and connection of the RS485 line must be checked. Steps: Check the RS485 connection, observe the inverter manual (available on the web). RS485 port: COM1 RS485 port: COM2 Correctly locate the inverter's RS485 port...
Page 17
Multiple inverters (up to 60 Inv.) PV Monitoring PV monitoring (EzLoggerPro) (Wi-Fi / LAN) Multiple inverters (up to 60 Inv.) PV + Load monitoring + Export limit (SEC1000) PV + Load monitoring + Export limit (SEC1000) Data may change without prior notice...
Page 18
5.2 Diagrams: C&I + Weather Station • Adding a Weather Station using an EzLoggerPro Weather Station (Modbus RTU) EzLoggerPro Multiple inverters (up to 60 Inv.) PV + Load monitoring + Export limit (SEC1000) Weather Station (EzLoggerPro) Data may change without prior notice...
Page 19
5.3 Diagrams: C&I and Utility scale PV plants • Optical fiber ring between subsystems and communication to inverters via RS485 or PLC Multiple inverters Multiple inverters Communication via RS485 y Optical fiber Communication via RS485 y Optical fiber SCB1000 SCB3000: SMT & HT series SCB2000: MT series Data may change without prior notice...
Need help?
Do you have a question about the SEC1000 and is the answer not in the manual?
Questions and answers
где скачать свежую прошивку для контроллера SEC1000