Download Print this page
Goodwe SEC1000 Quick Installation Manual

Goodwe SEC1000 Quick Installation Manual

Hide thumbs Also See for SEC1000:

Advertisement

Quick Links

SEC1000
Setup Guideline
April 2021

Advertisement

loading
Need help?

Need help?

Do you have a question about the SEC1000 and is the answer not in the manual?

Questions and answers

Алексей
June 30, 2025

где скачать свежую прошивку для контроллера SEC1000

Summary of Contents for Goodwe SEC1000

  • Page 1 SEC1000 Setup Guideline April 2021...
  • Page 2 SEC1000 C&I 1. The SEC1000 2. How to set up the EzLoggerPro 3. How to upgrade the firmware 4. Checks 5. Diagrams Data may change without prior notice...
  • Page 3 1.1 The SEC1000 Functions • Monitoring up to 60 inverters • Export power limit function SEC1000 equipped with: • Load monitoring • IP65 cover • Reactive power control • AC switch • Massive update of FW • EzLoggerPro • Setup using SW Promate •...
  • Page 4 1.2 The SEC1000 1. IP65 Cover 2. AC switch 3. EzLoggerPro 4. 3-pase meter 5. CT terminal (X/5 A) AC Line RS485 (Reserved) Ethernet Current transformer (X/5 A) Data may change without prior notice...
  • Page 5 1.3 The SEC1000: current transformers • Current Transformers (CTs) are not included in the SEC1000 • CTs must be appropriate to the electrical installation where they will be installed • They must be installed in an ideal location to record the import/export flow •...
  • Page 6 2.1 Set up EzLoggerPro: Software Promate • Download the Promate software from goodWe's website: www.goodwe.com/downloads.asp Data may change without prior notice...
  • Page 7 2.2 Set up EzLoggerPro: Ethernet connection Set up your computer (PC) • Connect an Ethernet cable to your laptop and The EzLoggerPro Ethernet port • Set up your computer's Ethernet connection before using Promate software Data may change without prior notice...
  • Page 8 2.3 Set up EzLoggerPro (I) SEC1000 • Make sure your computer's Ethernet connection is set up correctly You need: • Computer • LAN Cable • Reset Software Promate (available on the web) Steps: Connect the computer to the Ethernet port of the EzLoggerPro Press the "Reset"...
  • Page 9 2.4 Set up EzLoggerPro (II) Confirm version FW Confirm status Confim Confim Step 1: Step 2: Step 3: • Check the connection status with the equipment • Activate the corresponding COM port • Refresh the list of inverters • Connection Succeeds: correct •...
  • Page 10 2.5 Set up EzLoggerPro (III) Step 4a: • Click on the "Export Enab" box Step 4b: Step 4c: Example "CT Ratio" of Transformer 250/5A • Indicate the power of the PV system in the "Total Capacity" field • Indicate the ratio of the current transformer installed •...
  • Page 11 • Proceed according to IP connection type: static (5A) or dynamic (5B) LED sequence, if IP Dynamic Step 6: • Disconnect the computer from the SEC1000 • Connect the router cable to the ethernet port of the EzLoggerPro Dynamic IP...
  • Page 12 • In order to be able to display the consumption and meter curves, the firmware (FW) of the EzLoggerPro must be upgraded, using a USB memory stick. • If necessary, you must update the SEC1000 using a USB stick. AC switch...
  • Page 13 4.1 Check the SEMS Portal • The SEC1000 must be added to the FV plant in SEMS next to the inverter(s). • The correct display in the SEMS Portal must be checked. Steps: Confirm that the SEC1000 has been added to the plant correctly •...
  • Page 14 4.2 Check the CT • The correct setting, location and direction of the current transformers (CT) should be checked • CTs must be installed near the meter. Checking the displayed real time data: Example "CT Ratio" of Transformer 250/5A 1. Turn OFF the PV system 50 ...
  • Page 15 4.3 Check the CT • The correct setting, location and direction of the current transformers (CT) must be checked • CTs must be installed near the meter. Main breaker. Main breaker. Meter Meter AC Switch AC Switch … … Line 1 Line 2 Line 3 PV System...
  • Page 16 4.4 Check the RS485 connection SEC1000 • The correct installation and connection of the RS485 line must be checked. Steps: Check the RS485 connection, observe the inverter manual (available on the web). RS485 port: COM1 RS485 port: COM2 Correctly locate the inverter's RS485 port...
  • Page 17 Multiple inverters (up to 60 Inv.) PV Monitoring PV monitoring (EzLoggerPro) (Wi-Fi / LAN) Multiple inverters (up to 60 Inv.) PV + Load monitoring + Export limit (SEC1000) PV + Load monitoring + Export limit (SEC1000) Data may change without prior notice...
  • Page 18 5.2 Diagrams: C&I + Weather Station • Adding a Weather Station using an EzLoggerPro Weather Station (Modbus RTU) EzLoggerPro Multiple inverters (up to 60 Inv.) PV + Load monitoring + Export limit (SEC1000) Weather Station (EzLoggerPro) Data may change without prior notice...
  • Page 19 5.3 Diagrams: C&I and Utility scale PV plants • Optical fiber ring between subsystems and communication to inverters via RS485 or PLC Multiple inverters Multiple inverters Communication via RS485 y Optical fiber Communication via RS485 y Optical fiber SCB1000 SCB3000: SMT & HT series SCB2000: MT series Data may change without prior notice...
  • Page 20 Thank you!