2-way Valve Assembly
Valve Disassembly
Valve Reassembly
1. Lubricate all gaskets with high-grade silicone grease.
2. Torque end cap to 175 ± 25 in-lbs [8,5 ± 1,1 Nm]
3. Replace solenoid base gasket, core assembly with core spring and solenoid base sub-assembly
or plugnut/core tube sub-assembly and valve bonnet.
4. Tighten solenoid base sub-assembly.
5. Reinstall solenoid. Then make electrical hookup to solenoid.
*
Indicates parts supplied in rebuild kit (P/N 62650-14).
Note: A spanner nut P/N 62650-15 will be needed for disassembling core
housing from body.
40