Download Print this page

Advertisement

Quick Links

Growatt New Energy
Download
Manual
Growatt USA,Inc
9227 Reseda Blvd,#435 Northridge,CA 91324,USA.
T
1(866) 686-0298
E
usaservice@ginverter.com
www.growatt-america.com
W
GR-UM-251-A1-00
MIN 3K-11.4K TL-XH-US
&
Commissioning Guide

Advertisement

loading
Need help?

Need help?

Do you have a question about the MIN 3K-11.4KTL-XH-US and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Growatt MIN 3K-11.4KTL-XH-US

  • Page 1 Growatt New Energy Download MIN 3K-11.4K TL-XH-US Manual & Commissioning Guide Growatt USA,Inc 9227 Reseda Blvd,#435 Northridge,CA 91324,USA. 1(866) 686-0298 usaservice@ginverter.com www.growatt-america.com GR-UM-251-A1-00...
  • Page 2 List 1 Power on the system 1.1 Energy Management System Introduction 1.2 Check System Installation & Power On 2 ShineTools APP Setup 2.1 APP Download 2.2 APP Introduction 2.3 Connecting to Local Wi-Fi Network 3 Grid Code Mapping Table 4 Wi-Fi Network Configuration 5 Energy Management System 5.1 Management System Mode Introduction...
  • Page 3: Power On The System

    1 Power on the system MIN 3K-11.4KTL-XH-US AC Couple system diagram is shown in the figure below: 1.1 Energy Management System Introduction MIN 3K-11.4KTL-XH-US energy storage system diagram is shown in the figure below: Power Wire Signal Wire Power Wire...
  • Page 4 Integrated in SYN 200-XH-US. Ø MIN 3-11.4K TL-XH-US inverter. Ø ATS. Product Model Function Note Energy Inverter MIN 3K-11.4KTL-XH-US conversion ARO Battery ARO 6.6-19.8H-C1-US Energy storage UP TO 4 LG Battery RESU10H/16H Prime Energy storage UP TO 2 Fig 1.6...
  • Page 5 2 ShineTools APP Setup 2.3 Connecting to Local Wi-Fi Network 2.1 APP Download The steps for using APP are as follows: There are two ways to download the ShineTools APP: Setup local Wi-Fi to communicate with the inverter a) Scan the QR code 2.Enter the default 1.Login interface 3.Tap in Direct WiFi...
  • Page 6 2.4 Local Commissioning Main Interface Introduction 7. Tap in Next 8. Tap in Auto refresh The main interface of local commissioning consists of three parts: Now this APP has been connected to the built-in Internal information Power generation WIFI of the inverter. Fault warning message viewing and parameter information...
  • Page 7: Wi-Fi Network Configuration

    Wi-Fi Network Configuration 4 3 Grid Code Mapping Table First time install the inverter, the inverter needs to be configured to connect to the home The factory Default grid mode of the inverter is IEEE1547-240, which can adapt to the Wi-Fi to ensure the remote monitoring.
  • Page 8: Energy Management System

    5 Energy Management System Notice: First time install the energy storage system, charge the battery for at least 1 hours Maximum self- Use PV production for self-consumption, then charge/discharge or up to 60% SOC before powering off the system. This action will keep up the battery consumption battery as needed to maximize self-consumption power to avoid running out while waiting for PTO.
  • Page 9 5.2.1 Power Sensor Setting 5.2.2 AC Charging Setting The AC charging is used to set whether to allow charging the battery from the Grid. If an electric meter is installed in the system, please set. Factory Default is Disabled. Factory Default is Disabled. Note: Power Sensor: iOS = Electric meter 1.Tap in Charge and Android = Meter...
  • Page 10 5.2.4 AC Couple Setting 5.2.6 EMS Mode Setting: The AC Couple setting is what the AC COUPLE system needs to set If an ARO battery is installed in the system, you need to set the energy storage mode. Factory Default is Disabled. Factory Default is Maximum Self-Consumption.
  • Page 11 Battery Life Maintenance 6 (Important) 4.Select the Quarter to be For Backup ONLY scenarios ,it's done on No. 5 set, Four quarters can be 4.Select the TIME to be set 5.Select the YEAR to be set a) TUnplug Battery power, Battery Communication cables and turn OFF battery modules You only need to select the season or year to set.
  • Page 12: Troubleshooting

    7 Commissioning Error Code Troubleshooting 1.Immediately disconnect the DC switch and check the PV Enter the local commissioning home page, and view the fault and alarm information on Too many PV panels voltage. Error 202 PV Voltage High the main interface if there are exist after installation. The fault and alarm code on the connected in series 2.If the fault code still exists ShineServer Page will be the same in the APP.
  • Page 13 Account and plant information will be the same in both the web browser version and on the ShinePhone App. 8.1 Register an Account a) Log in to our monitoring website http://server-us.growatt.com and click Register an Account. c) Fill in the appropriate power plant information in order to complete the power plant creation.
  • Page 14 Shinephone Introduction 9 9.1 APP Download There are two ways to download the ShinePhone APP: c) Scan the QR code Fig 9.1 ShinePhone downloading QR code b) When you have completed these steps, you will be able to view the inverter system remotely through the ShinePhone APP and through any browser.
  • Page 15 3.Fill the plant info your PV system would be authorized and monitored by your installer. 4.Continue fill the plant 5.Tap in skip 6. Add collector info Growatt USA,Inc 9227 Reseda Blvd,#435 Northridge,CA 91324,USA. 1(866) 686-0298 usaservice@ginverter.com www.growatt-america.com...