Daikin Emura 3 Series Service Manual page 58

Table of Contents

Advertisement

4
|
Components
To install the switch box
Service manual
58
draft – 22/04/2022 08:50
a Power supply terminal X1M
b Power supply wiring bracket
c Screw (ground wire)
d Indoor unit main PCB
e Switch box screw
f Switch box
5 Disconnect the connectors of the indoor unit fan motor and the swing flap
motors from the indoor unit PCB.
6 Detach these wiring harnesses from the switch box.
7 Remove the screw and remove the switch box from the indoor unit.
8 To install the switch box, see
1 install the switch box in the correct location on the indoor unit.
a Power supply terminal X1M
b Power supply wiring bracket
c Screw (ground wire)
d Indoor unit main PCB
e Switch box screw
f Switch box
2 Route the connectors of the indoor unit fan motor and swing flap motors
inside the switch box and connect them to the indoor unit PCB.
3 Install and tighten the screw to secure the switch box.
c
a
d
e
b
4
"4.1 Plate
work" [
c
a
d
e
b
f
 48].
f
RXJ20~50A + FTXJ-A(W)(S)(B)
Split Emura 3 R32
ESIE22-04 – 2022.04