Indoor Unit - Daikin Emura 3 Series Service Manual

Table of Contents

Advertisement

4.1.2 Indoor unit

To open the front panel
RXJ20~50A + FTXJ-A(W)(S)(B)
Split Emura 3 R32
ESIE22-04 – 2022.04
a Cable tie
b Switch box
7 Install the insulation on the upper side of the switch box.
a Insulation
b Main PCB
1 Stop operation by
Result: The front panel closes automatically.
2 Open the front panel using the wireless remote control.
Result: The front panel opens.
3 Turn the power supply OFF.
4 Pull down both locks on the back of the front panel.
5 Open the front panel until the support fits into the fixing tab.
b
b
a
.
4
|
Components
a
Service manual
draft – 22/04/2022 08:50
53

Advertisement

Table of Contents
loading

Table of Contents