Startup And Checkout; Installation Checkout; Notes On Installation - Cleveland Steam Cooker and Rethermalization Unit 22CET3A Operator's Manual

Steam cooker and rethermalization unit
Hide thumbs Also See for Steam Cooker and Rethermalization Unit 22CET3A:
Table of Contents

Advertisement

3-Phase Units
WATTS
VOLTS
PHASE
6400
208
3
5440
220
3
6400
240
3
9400
208
3
7960
220
3
9400
240
3
1-Phase Units
WATTS
VOLTS
PHASE
6400
208
1
5440
220
1
6400
240
1
9400
208
1
For supply connection use only copper wire suitable for at least 75° C (167° F).
C. STARTUP AND CHECKOUT
The Startup and Checkout procedure prepares a recently installed or repaired steamer for operation. The
procedures check proper installation and electrical connection of the steamer, and verify basic steamer
operation.

1. Installation Checkout

Use the Installation Checklist Table 4-2, to check the overall installation.
TASK
Preparation
Verify electric power requirements
Check operating location clearances
Verify Field Assembly of Unit
Verify Field Assembly of Stand (if applicable)
Installation
Verify Steamer is Level
Check drain line connection
Check water supply connection
Test water supply lines
Check electrical line connection
Perform Startup and checkout

Notes on installation:

Table 4-1 Minimum Wire Requirements
WIRES
CYCLE
AMPS
HERTZ
3
60
17.8
3
60
14.3
3
60
15.4
3
60
26.1
3
60
20.9
3
60
22.6
WIRES
CYCLE
AMPS
HERTZ
2
60
30.8
2
60
2
60
26.7
2
60
45.2
Table 4-2. Installation Check List
31
SUPPLY CONNECTION
WIRE SIZE (COPPER)
12
14 (12 recommended)
14 (12 recommended)
10
10
10
SUPPLY CONNECTION
WIRE SIZE (COPPER)
8
25
10
10
6
REFERENCE
Page No.
30
20
24-26
21-24
25
26
27
29
29
31
HEATER RATED
VOLTAGE
208
240
240
208
240
240
HEATER RATED
VOLTAGE
208
240
240
208
COMPLETED
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____

Advertisement

Table of Contents
loading

This manual is also suitable for:

Steamchef 322cet3a series

Table of Contents

Save PDF