Connecting Modular Cords (FS-1128MFP only)
SETUP GUIDE
1
Turn the power switch off (O).
2
Connect the modular cord with the attached
ferrite core to the line jack (A) of the
machine. Then, connect the modular cord to
the telephone jack (B) of the machine.
3
Route the cords as shown in the figure.
4
Turn the power switch on (|). The machine
begins to warm up. If the mache is first
installation, it will begin replenishing the
toner; this will take approximately 15
minutes.
Once the toner has been replenished,
Ready to copy will appear on the
message display.
Preparations
A
B
9