Marking For Unit Fixing Position; Fix The Moistureproof Sheet And Packing; Installation Of Unit - Takara Belmont YUME DX Installation Instructions Manual

Shampoo unit
Table of Contents

Advertisement

5-3. Marking for unit fixing position

Use supplied full scale template to mark the
fixing position on the floor. Check the piping
and power outlet position before marking.
1. Put the supplied templete on the floor and hold with
the tape etc. It should be set to the position of
piping and power outlet.
2. The chair fixing position is marked on the floor.
3. Make it holes for marked position. (8.5 mm x 50 mm )
4. Remove the template from the floor.

5-4. Fix the Moistureproof sheet and packing

Please obtain the moistureproof sheet and the moistureproof packing to prevent from the
main body damaged by the moisture. Deterioration and the breakdown of structural parts
and electrical equipments might not be occurred without the installation.
1. Fix the moistureproof sheet on the floor.
Plywood Floor : Wood Screw
Concrete Floor : Glue
2. Make a cut in the moistureproof packing according to piping position.
3. Peeled off the sheet on the adhesive face side of the moistureproof packing. Passes under the
piping and electric code on the moistureproof packing and attach to the floor.
4. Seal a space around the piping and electric code.
Moistureproof Sheet

5-5. Installation of unit

1. Remove the four tapping screw(M8 x 60mm) fixing the
unit base plate to the pallet.
Water supply pipe
Moistureproof
Packing
-7-
Marking
Hot water supply pipe
Drain pipe
Moistureproof Packing
Seal a space
around here
Tapping Screw(M8 x 60)
Base
Power supply outlet
Power cable
Pallet

Advertisement

Table of Contents
loading

Table of Contents